
Type: Inline connection blockThread: 1/4"Compatible with: HAWE CDK 3Max pressure: up to 500 bar (depending on valve)Max flow: up to 22 l/min (CDK 3)
106,86 €

PACK KYLE press TUBOMATIC H47PM OR+P (max Ø 46 mm) with fittings and hose
PACK KYLE composed by press TUBH47PM (max Ø 46 mm) with fittings and hose.
1 567,60 €

PACK KENNY press TUBOMATIC H47E OR+P (max Ø 46 mm) with fittings and hose
PACK KENNY composed by press TUBH47E (max Ø 46 mm) with fittings and hose.
1 567,60 €

Racor T/L-MF JIC/BSPP 1"1/16-3/4"
13,70 €

188,42 €
Empty the cooling circuit.
To clarify the circuit by adding clean water and emptying it again.
Fill the circuit with clean water and add the dose of Pattex Nural 1.
Starting the engine a minimum of 30 minutes, empty and rinse until all the dirt or with the engine stopped, keep the product in the circuit 12 to 24 hours and then empty and rinse until the water clean.
Fill again with water.